Wind energy plants
Sweden

Developer / Client:

  • Enercon GmbH, Aurich

Project Period:

  • 2009 to 2010

Project Description:
  • Enercon GmbH built a total of six wind energy plants type E-82 in Isgrannatorp, Ugglum and Vattlösa in Sweden
  • The load transfer into the ground is made via deep pile foundations with circular footings with 36 pre-fabricated driven piles. Additionally, the WEA foundations are secured by ground anchors (GEWI piles)
Scope of Service:
  • Examination of the technical documents
  • Viewing and examination of work instructions and quality management plans
  • Assistance, supervision, and evaluation of anchor works
  • Consulting and support in geotechnical all aspects
  • Geotechnical expert
  • Independant quality check on site